The Investment

What Does a Kitchen Remodel Actually Cost?

It’s the first question almost everyone asks, and the honest answer has two parts, not one: what kind of project it is, and how big the space is. A number given before both are understood isn’t an estimate. It’s a guess.

National industry data puts the full range of kitchen remodels somewhere between $15,000 and $130,000+, depending on scope and size. That’s a wide enough range to be almost meaningless on its own. Here’s what actually narrows it down.

Range reflects aggregated 2026 national industry data (HomeAdvisor, Angi, and the Zonda/Remodeling Magazine Cost vs. Value Report), not Timberhaus Studio pricing. Kansas City costs will move around this range based on local labor and material choices.

Two Variables, Not One

The shape of the project, whether it’s a Refresh, a Full Remodel, or Reconfigured, determines the kind of work involved: whether plumbing and electrical move, whether walls come down, whether an engineer and a permit set are part of the job before construction even starts. This is the difference in complexity.

The size of the space determines the quantity of everything within that complexity: how much cabinetry, how much countertop, how many linear feet of tile. A 120-square-foot kitchen and a 400-square-foot kitchen can both be a straightforward Refresh, and still land in very different places on the range, simply because one has four times the material and labor to cover.

Shape and size move independently of each other. A large Refresh can cost more than a small Full Remodel. Neither number means anything until both are known, which is the whole reason we start in your house instead of on the phone.

This is exactly why we don’t quote a price on the first call. We need to understand both the shape of your project and the size of your space. A real number follows Discover and Design, not before it.

What’s Actually Inside the Number

Most homeowners picture cabinets, countertops, and tile. Those are the visible part, and they’re rarely the whole story. A complete remodel budget also carries:

A quote that only prices the visible materials isn’t cheaper. It’s incomplete. The rest tends to surface later, after demolition, when you have the least leverage to do anything about it.

What Moves the Number Most

Within any given scope, a handful of decisions account for most of the variation between one project and another:

Bathrooms Follow the Same Logic

A bathroom is a smaller room, so the material quantities are smaller. But the density of work per square foot is higher. Nearly every surface is wet-rated, waterproofing and tile work are labor-intensive, and there’s plumbing in a space where there’s very little room to move it. That’s why a bathroom rarely costs proportionally less than its square footage suggests.

Converting a tub to a curbless, zero-entry shower is a good example: it’s a modest footprint, but it involves re-sloping the floor, rebuilding the drain, and waterproofing the entire assembly. The scope, not the size, is what sets the number.

Why the Lowest Bid Often Isn’t

When two estimates for the same project are far apart, the gap usually isn’t craftsmanship. It’s what each one chose to include.

When you’re comparing estimates, the useful question isn’t which number is lowest. It’s which one is complete.

For our part, we don’t work in allowances. Selections are made and priced during Design, before construction starts. The tile, the fixtures, and the countertop in your estimate are the ones going into your house, at the price you already agreed to.

The same logic holds whether it’s a kitchen remodel or a bathroom remodel. Scope and size drive the number, not the room. If you want to know where your own project is likely to land, that’s a conversation, not a calculator.

Common Questions

Why won’t you give me a price over the phone?

Because any number given before we’ve seen the space and understood the scope is a guess, and a guess that’s wrong in either direction costs you something. Too low and it becomes a change order later. Too high and you rule out a project that was actually within reach.

Can you design to a budget I’ve already set?

Yes, and it’s a better way to work than the alternative. A real budget shared during Discover shapes the design from the start, telling us where to invest and where to hold back, instead of producing a beautiful plan that gets value-engineered down after you’ve already fallen for it.

What’s usually the most expensive part of a kitchen remodel?

Cabinetry, on most projects. It’s the largest volume of material in the room and the most labor to fabricate and install, and the range between stock and fully custom is wide enough that it often determines what the rest of the budget can absorb.

Does the price change once work starts?

The scope and price are settled during Design, before construction begins, so the plan you approve is the plan we build. If something genuinely unexpected turns up behind a wall, we bring you the options and the cost before any work proceeds, not after.

Do you use allowances in your estimates?

No. Allowances are placeholder numbers for selections that haven’t been made yet, and they’re a common reason a project ends up costing more than the estimate said. We make and price selections during Design instead, so what’s in your number is what goes in your house.

Is your work warrantied?

Yes. Our installation work carries a one-year warranty. Products, fixtures, and appliances also carry their own manufacturer warranties, which we’ll walk you through as part of handing the project over.

Can a project be phased to spread out the cost?

Sometimes, and it’s worth raising during Discover. Some work splits cleanly across phases; other work is far more expensive done twice, because it means opening the same walls or floors again. Which applies to your project depends on what you’re trying to accomplish.